3. Deploy the IPMVP protocol and draft the activity report
Deployment of the protocol and preparation of an M&V plan is an essential step towards reliable assessment of energy and financial savings.
A complete M&V plan and the report drawn up at the end of this process must include the 13 points listed below. The design office or SSEE in charge of implementing the process must comply with them, while the plant/site operator has the right to demand that all these points be addressed.
3.1 1. Identify the goals of EEAs (energy efficiency improvement actions)
Describe these improvement actions, the expected result and the commissioning procedures. Identify any planned changes to baseline conditions (e.g. temperature settings in unoccupied buildings).
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Energy resources and storage
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Deploy the IPMVP protocol and draft the activity report
Bibliography
Also in our database
Bibliography
Concepts et options pour l’évaluation des économies d’énergie et d’eau September 2010 (prepared by Efficiency Valuation Organization ).
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference