Practical sheet | REF: FIC1775 V1

Deploy the IPMVP protocol to track energy savings

Author: Christophe MARVILLET

Publication date: December 10, 2022 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!

Automatically translated using artificial intelligence technology (Note that only the original version is binding) > find out more.

    A  |  A

    1. Specify the objectives of the IPMVP protocol and describe the activities of the M&V plan (measurement and verification).

    The deployment of the IPMVP protocol includes a number of objectives, some of which are listed here.

    • Increase energy savings: accurate determination of energy savings gives facility owners and managers valuable guidance on their energy conservation measures (AEE/MCE).

    • Document financial transactions: energy savings are the basis for performance-based financial payments or guarantees in a performance contract (CPE in particular). A well-defined and implemented M&V plan can be the basis for documenting performance transparently and subject to independent verification.

    • Increase funding for efficiency projects: a good M&V plan increases the transparency and credibility of efficiency investment results. It also increases the credibility of efficiency investment projections....

    You do not have access to this resource.

    Exclusive to subscribers. 97% yet to be discovered!

    You do not have access to this resource.
    Click here to request your free trial access!

    Already subscribed? Log in!


    The Ultimate Scientific and Technical Reference

    A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
    + More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
    From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

    This article is included in

    Energy resources and storage

    This offer includes:

    Knowledge Base

    Updated and enriched with articles validated by our scientific committees

    Services

    A set of exclusive tools to complement the resources

    Practical Path

    Operational and didactic, to guarantee the acquisition of transversal skills

    Doc & Quiz

    Interactive articles with quizzes, for constructive reading

    Subscribe now!

    Ongoing reading
    Specify the objectives of the IPMVP protocol and describe the activities of the M&V plan (measurement and verification).
    Outline