7. Mistakes to avoid

7.1 Don't neglect round-trip biogas networks

If it's impossible to inject into the gas network (network saturation, non-compliant gas, breakdown at the injection station), you can opt for round-trip biogas networks. The interface between the injection station and the biogas production unit is a flange located at the injection station. The return piping at the injection station is affected on the outward side by the biomethane and on the return side by the non-compliant biomethane or the problem at the injection station. Piping, valves and instrumentation are used to manage non-compliant biomethane. These networks can be ordered as an option from the supplier of the biogas production plant or from a piping company. Isolation valves can also be provided on both sides of the flange...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Energy resources and storage"

( 201 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us