4. Different controls performed by a Spanc
4.1 Compliance of new installations
This inspection is provided for in article 3 of the Order of April 27, 2012 on the terms and conditions for carrying out the inspection of installations.
It is carried out through Spanc's verification of the application file for the installation of a non-collective sanitation system, which must be submitted to the local authority by the owner wishing to install an individual sanitation system.
Carried out by Spanc agents, who are specialized in this field, this initial inspection ensures that the installations are operating correctly and in compliance with the health and environmental legislation and regulations in force at the time.
The first step is a careful analysis of...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Different controls performed by a Spanc
Article included in this offer
"The finishing and equipment of the building"
(
89 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!