Geomembrane assembly
Composition and Production of Geomembranes
Article REF: C5435 V1
Geomembrane assembly
Composition and Production of Geomembranes

Author : Jean-Pierre GIROUD

Publication date: August 10, 2015 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Geomembrane assembly

3.1 Factory or workshop assembly

Some geomembranes can be assembled in a factory or workshop, in the form of large sheets obtained by joining the strips together. The assembly shop may be part of the sheet production plant, or may be independent. The way in which the strips are assembled depends on the type of geomembrane (see § 3.3 ). The large sheets assembled in the workshop are then folded. Once a sheet has been folded in one direction, it can be folded in the other. This method is not recommended,...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Public works and infrastructure"

( 88 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details