3. Geomembrane assembly
3.1 Factory or workshop assembly
Some geomembranes can be assembled in a factory or workshop, in the form of large sheets obtained by joining the strips together. The assembly shop may be part of the sheet production plant, or may be independent. The way in which the strips are assembled depends on the type of geomembrane (see § 3.3 ). The large sheets assembled in the workshop are then folded. Once a sheet has been folded in one direction, it can be folded in the other. This method is not recommended,...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Geomembrane assembly
Article included in this offer
"Public works and infrastructure"
(
88 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Websites
-
CFG – French Geosynthetics Committee
-
IGS – International Geosynthetics Society
- ...
Events
-
International Congress on Geosynthetics
Organized under the aegis of the International Geosynthetics Society (IGS), the congress is held every four years: Paris (1977), Las Vegas (1982), Vienna (1986), The Hague (1990), Singapore (1994), Atlanta (1998), Nice (2002), Yokohama (2006), Guaruja/Sao Paulo (2010), Berlin (2014), Seoul (2018).
Regional congresses,...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!