Practical sheet | REF: FIC1600 V1

Key requirements beyond ISO 9001

Author: Patrick MÉRAS

Publication date: June 10, 2017 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


5. Mistakes to avoid

5.1 Don't neglect equipment metrological verification intervals

Quality management systems must be efficient, effective and effective. Equipment management and control are no exception.

A great deal of data is recorded during metrological checks and calibrations. Recording data without analyzing it and making decisions does not improve efficiency or effectiveness.

Data processing should lead to optimization of the frequency of metrological confirmations of measuring instruments, with a view to increasing the effectiveness of metrological control (see Bibliography section).

SCROLL TO TOP...
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Quality manager

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Mistakes to avoid