What reference framework can we use?
Instrumented risk control measures
Practical sheet REF: FIC1276 V1
What reference framework can we use?
Instrumented risk control measures

Author : Olivier IDDIR

Publication date: July 10, 2014 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. What reference framework can we use?

Article 7 of arrêté du 4 octobre 2010 stipulates that the initial status and monitoring plan must be drawn up either on the basis of a professional guide recognized by the Minister for the Environment, or on the basis of a methodology developed by the operator. In the latter case, the prefect may require a critical analysis by an external expert body chosen by the operator in agreement with the authorities.

The methodological guide for the management and control of the ageing of instrumented risk control measures (MMRI) DT 93 of July 2011 presents :

  • ageing mechanisms ;

  • ...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
What reference framework can we use?

Article included in this offer

"Environment manager"

( 296 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details