Practical sheet | REF: FIC0105 V1

Performance review: planning for possible follow-up

Author: Ismahane EL BAHLOUL

Publication date: April 10, 2014 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


3. Our advice

3.1 Perform a self-assessment of your operating results using the completeness grid provided by the Classified Installations Inspectorate.

Once your operating report has been drafted, and before sending it to the Classified Installations Inspectorate for appraisal, take the time to self-assess your file, using the same tool as the authorities: the operating report reading or completeness grid [FIC 0047] . This essential step will enable you to check that you haven't overlooked a...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Environment manager

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Our advice