Practical sheet | REF: FIC0105 V1

Performance review: planning for possible follow-up

Author: Ismahane EL BAHLOUL

Publication date: April 10, 2014 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


5. Frequently asked questions

What are the risks if an operator fails to submit an operating report?

If the operator fails to submit the operating report to the prefect, the latter may apply the administrative sanctions [FIC 0099] provided for in the regulations governing classified installations. The prefect must give the operator concerned formal notice to submit the report within a short timeframe (three months, for example), and then, if the operator has still not submitted the operating report, apply the administrative sanctions.

What is meant by "the inspectorate...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Environment manager

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Frequently asked questions