Mistakes to avoid
Performance review: planning for possible follow-up
Practical sheet REF: FIC0105 V1
Mistakes to avoid
Performance review: planning for possible follow-up

Author : Ismahane EL BAHLOUL

Publication date: April 10, 2014 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. Mistakes to avoid

4.1 Do not use different data from those submitted with your annual declarations.

Your operating report is a summary of data relating to the operation of the site over the last ten years. It is not a question of reinventing the data or establishing new ones. As part of the operation of an ICPE, certain annual declarations are mandatory (waste reports, atmospheric emission measurement campaigns, noise measurements, energy reports, etc.). These data, which are transmitted to the Classified Installations Inspectorate, will be used in the analysis of your operating report. Data that differs from that submitted during the ten-year period in question could raise questions and lead to requests for further information.

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Environment manager"

( 296 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details