Practical sheet | REF: FIC0105 V1

Performance review: planning for possible follow-up

Author: Ismahane EL BAHLOUL

Publication date: April 10, 2014 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


2. Identify possible outcomes

The ten-year review enables the prefect to take stock of the prefectoral decree and assess whether it is still relevant in the light of operating conditions and regulatory obligations.

Analysis of an operating report should lead to one of the following conclusions:

2.1 No further information

Updating the requirements of your prefectoral AP authorization order is not necessary for the facility to comply with the provisions of the IPPC directive on integrated pollution prevention and control. In this case, please notify the operator by letter.

SCROLL TO TOP...
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Environment manager

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Identify possible outcomes