7. Mistakes to avoid
7.1 Don't limit yourself to existing repositories
These include PMBoK, standards documents such as ISO 21 500 and ISO 10006.
Because every project is unique, failing to analyze its specific features and associated skills only increases the project's "hidden risks".
SCROLL TO TOP7.2 Don't lose sight of the fact that a project team is not just a juxtaposition of individual skills.
It also constitutes a group representing a collective skill (the whole is worth more than the sum of its...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Mistakes to avoid
Bibliography
A Guide to the Project Management Body of Knowledge from the Project Management Institute, (PMBOK ® Guide), 6 th edition
Downloadable tools
Tool
The multi-skill grid (Tool ...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference