2. Work in short, fixed-duration iterations
A Scrum project operates in the form of iterations of fixed duration that follow one another. During each iteration, a new part of the product-project is developed and added to the existing product-project.
At the end of each iteration, the product-project is presented to users and project managers. Feedback and requirements are taken into account to define future developments. The process is repeated until the entire project product has been developed.
What characterizes an agile process, whatever the method, is the ability to adapt: to a changing economic context, to changing needs, to a new customer, to technical difficulties. The key to the approach that underpins the process lies in this ability to adapt. This is achieved in particular through short iterations of fixed duration.
Customers...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Work in short, fixed-duration iterations
Article included in this offer
"Design and engineering management"
(
337 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Downloadable tools
Tool
The vortex approach (Tool ...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!