Practical sheet | REF: FIC1504 V1

KANBAN-based operational management of project teams

Author: Stefan CSÖSZ

Publication date: July 10, 2015 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


5. Mistakes to avoid

5.1 Don't forget workflow limitations

Limiting flows is essential for the various stages. This is how team productivity develops. Without flow restrictions, there's a real risk of lower productivity due to demotivation.

SCROLL TO TOP

5.2 Don't hide your dashboard

An operational flow control dashboard needs to be easily accessible and visible to all concerned. The key is to find a place that allows good visibility, with enough space to gather around it.

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Design and engineering management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Mistakes to avoid