6. What are the five stages of the linear friction-welding cycle?
Don't forget that the machine is soundproof.
All production requires the machine to be opened up first, to give the operator access.
Opening the press takes a lot of time!
While soldering time lasts between 5 and 10 seconds, supply door opening time is often of the order of 1 to 3 seconds.
The average cycle time for vibration welding is around 30 seconds.
6.1 First time
The machine's protective door opens and feeding is possible.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
What are the five stages of the linear friction-welding cycle?
Products and suppliers
3454 route de Saint-Amour – Grande Belle Vavre – 01340 Foissiat (France)
Tel.: 04 74 22 45 41
234, Rue Georges-Charpak – Technosite Altéa – Mécasonic, 74100 Juvigny (France)...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference