Check the material conditions for a successful project review
Prepare and organize a design project review
Practical sheet REF: FIC0865 V1
Check the material conditions for a successful project review
Prepare and organize a design project review

Author : Jean DAUVERGNE

Publication date: April 10, 2012 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. Check the material conditions for a successful project review

You need to make sure that the project review goes off without a hitch; this requires arriving a few minutes to 1 hour before the scheduled time. If necessary, you can call on the assistant who has booked the meeting room!

Particular care must be taken to ensure that :

  • the room is tidy and clean, with no trace of the previous meeting; in particular, the flipcharts are new, with new markers, and there are enough chairs;

  • where appropriate, documents are distributed to each seat by name;

  • a few A4 sheets of paper and a ballpoint pen for each participant to take notes.

More technically, we need to ensure that :

  • the projector is in working order (provide a second one as...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Design and engineering management"

( 337 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details