2. The monitoring reference system: the batch sheet
In a maximum of six pages, the work package description (WPD) describes all the tasks to be carried out during the project, in order to achieve the cost, time and quality objectives set for the project.
The batch header contains all the information needed to link the batch to the Work Breakdown Structure or WBS (link with the sub-project and the project) and to the Cost Breakdown Structure or CBS (description of time allocation or material purchase codes).
The document is divided into five main sections:
Assumptions: the first elements presented in the document describe the major technical, industrial and commercial assumptions made by the lot manager when drawing up the document. The scope of the lot is thus defined in accordance with the general program assumptions previously established;...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
The monitoring reference system: the batch sheet
Bibliography
Afitep, Dictionnaire du management de projet , Éditions Afnor, 5th ed. 2010, ISBN 2124843419
Michèle Amelot: VBA Excel 2010 - Programmer sous Excel : Macros et Langage VBA , ENI Éditions, 2010, ISBN 978-2-7460-5461-5
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference