Classified installations ? Authorization request
Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

Overview

ABSTRACT

The study seeks to show the obligations the operator must meet for each situation. It lists all the items needed to make a regular, complete authorization request, and particularly impact assessment and risk assessment. The study finally presents the possible consequences of an authorization request: examining procedure, public inquiry, operational requirements, inspections of ICPE and administrative penalties.

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHOR

 INTRODUCTION

Authorization to operate a facility classified for environmental protection (ICPE) is an administrative authorization issued to a petitioner who has applied to the prefect of the département in which the activity is planned.

An application for an ICPE authorization may be accepted, but may also be refused with reasons. The response given by the authorities within an average period of 12 to 15 months – corresponds to the procedure for examining the – file, and is always associated with regulatory requirements and technical specifications to be met.

This is why the petitioner must accompany his letter of application with a substantial, well-argued file demonstrating the acceptability of the risk, so that the authorities can issue a tailor-made authorization, i.e. one that is adapted to the specific nature of the project, to local environmental and health conditions, to the best available techniques that are economically acceptable, and to national regulatory requirements.

This procedure is explained by the fact that the public authorities take into account the pollution, nuisance and risks that may be produced by the operation and affect not only populations, but also property and the environment in general.

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


KEYWORDS

principle   |   regulation   |   inspection   |   operational requirements   |   environment   |   industry

Ongoing reading
Classified installations for environmental protection (ICPE)

Article included in this offer

"Environment"

( 515 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us