How do you define the monitoring program and plan?
Instrumented risk control measures
Practical sheet REF: FIC1276 V1
How do you define the monitoring program and plan?
Instrumented risk control measures

Author : Olivier IDDIR

Publication date: July 10, 2014 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. How do you define the monitoring program and plan?

The operator must :

  • formalize its aging management and control methodology through a monitoring program covering the entire site, each MMRI and each MMRI component;

  • define the nature and frequency of inspections to be carried out.

The monitoring plan can be defined on the basis of :

  • reliability calculations and/or experience feedback (users, suppliers) and/or construction rules and standards ensuring a minimum risk reduction of 10 ;

  • applicable regulatory requirements or insurance rules;

  • suppliers' maintenance specifications and recommendations;

  • periodic unit shutdowns (scheduled or regulatory shutdowns).

  • ...
You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
How do you define the monitoring program and plan?

Article included in this offer

"Environment"

( 514 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details