Practical sheet | REF: FIC0544 V1

Risk management measures – Performance criteria

Author: Olivier IDDIR

Publication date: September 10, 2012, Review date: November 27, 2016 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!

Automatically translated using artificial intelligence technology (Note that only the original version is binding) > find out more.

    A  |  A

    Overview

    Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

    Read the article

    AUTHOR

    • Olivier IDDIR: Project Engineer, Expertise and Modeling Department, QHSES Division, Technip

     INTRODUCTION

    As part of hazard studies (EDD), industrial companies promote risk control measures (MMR). One of the requirements of the PCIG decree of September 29, 2005 is to be able to justify the efficiency of the MMRs selected: "To be taken into account in the probability assessment, risk control measures must be effective, have implementation kinetics in line with those of the events to be controlled, and be tested and maintained in such a way as to guarantee the sustainability of the aforementioned positioning". As a result, in the ESD, manufacturers are asked to characterize the MMRs used, justifying the following performance criteria:

    • efficiency ;

    • response time ;

    • probability of failure ;

    • testability ;

    • maintainability.

    You do not have access to this resource.

    Exclusive to subscribers. 97% yet to be discovered!

    You do not have access to this resource.
    Click here to request your free trial access!

    Already subscribed? Log in!


    The Ultimate Scientific and Technical Reference

    A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
    + More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
    From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

    This article is included in

    Environment

    This offer includes:

    Knowledge Base

    Updated and enriched with articles validated by our scientific committees

    Services

    A set of exclusive tools to complement the resources

    Practical Path

    Operational and didactic, to guarantee the acquisition of transversal skills

    Doc & Quiz

    Interactive articles with quizzes, for constructive reading

    Subscribe now!

    Ongoing reading
    Risk management measures – Performance criteria