Practical sheet | REF: FIC0038 V1

Requesting a building permit for an ICPE

Author: Solange VIGER

Publication date: May 10, 2018 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Overview

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHOR

 INTRODUCTION

You're planning to apply for planning permission (PC) for a new workshop, or to make modifications to buildings housing classified activities (ICPE). You're also in the midst of administrative procedures to obtain authorization to operate these activities.

For these two applications, addressed respectively to the prefecture – for the ICPE operating permit – and to the town hall where the project is located for the PC, provisions need to be made in the way these two procedures are carried out, particularly with regard to :

  • the concomitance of these two requests;

  • the documents required for each.

However, despite the independence of these two authorizations :

  • rules must be respected by the petitioner when submitting his application for a PC and his ICPE file;

  • provisions have been included in the appraisal procedure to ensure that both departments are kept informed of the progress of each of these two applications, and therefore of the conditions under which they will be issued.

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Environment

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Requesting a building permit for an ICPE