Practical sheet | REF: FIC0021 V1

Write a letter requesting authorization to operate

Author: Gérard GIRIN

Publication date: March 10, 2015, Review date: November 13, 2016 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


2. Detail your project

2.1 Specify the location where the installation is to be carried out

In addition to the department, municipality and address of the site where the plant is to be installed, the location should be specified by indicating the cadastral section (generally represented by one or two letters of the alphabet) and the parcel number(s) concerned.

Naturally, these details should be verified by consulting the minimum 1:2,500 scale plan of the area surrounding the facility, which should be included in the "Maps and plans" section.

Please note

The applicant may be the owner of the site or a tenant.

He may also own adjoining plots of land that are not affected by the planned facility....

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Environment

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Detail your project