4. Identify priority improvements
In the context of preventive maintenance, apply the FMECA method to identify priority improvements to be implemented to reduce the risk of energy system failure.
To reduce the criticality of failures, the three parameters that make up this criticality need to be modified.
4.1 Severity of failure
The impact of a failure, in terms of industrial production, building use and the safety of people and property, is an essential element of the analysis. It's not easy to reduce the severity of a failure.
However, some simple measures can mitigate the consequences of a failure.
From the point of view of personal safety: implement and ensure good practices in terms of safety,...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Energy resources and storage
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Identify priority improvements
Bibliography
Also in our database
Regulations
Loi n° 2021-1104 du 22 août 2021 combating climate change and building resilience to its effects.
Websites
From upstream to downstream of development projects (particularly energy projects), Cerema's multidisciplinary, cross-disciplinary expertise is invaluable. It is a valuable source of statistical data on energy consumption...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference