Mini and microtunnelers

Add to my library

C5572 V1 Article

Mini and microtunnelers

Author : Françis MAQUENNEHAN

Publication date: February 10, 2001 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

Overview

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHOR

  • Françis MAQUENNEHAN : Graduate of the Ecole des Ingénieurs de la Ville de Paris - SAGEP (Société Anonyme de Gestion des Eaux de Paris) Engineering Department

 INTRODUCTION

Engineers are increasingly faced with the problem of laying underground networks, whether in urban areas or across natural or man-made obstacles. The solution is not always simple, given the environmental constraints involved.

Most of the time, fluid networks are installed on their own site, i.e. each network is laid in isolation in the ground or overhead so as not to interfere with other networks.

Experiments were carried out to reduce maintenance costs, by having several networks coexist in a single structure. The first of these was carried out in Paris, where the sewer network built progressively since 1860 was designed not only to be accessible for maintenance, but also to accommodate the water pipes supplying subscribers. These sewers were later used by other public service concessionaires to set up telephone networks or to transport information by compressed air (pneumatic transport).

Today, with the exception of services that transport water in all its forms (drinking water, non-drinking water, chilled water), this cohabitation has become very difficult due to the constraints inherent in equipment maintenance personnel, leading concessionaires to seek a degree of independence by installing their facilities in an independent profile.

The underground networks needed to serve users have become progressively denser, taking up more and more underground space until the first few meters are saturated.

Among the various recent construction processes, the use of demini and microtunneling machines is a solution that enables the construction of a non-visitable underground structure, without trenching, in all types of soil, at depths ranging from 2 to 20 m, with good layout accuracy, bypassing existing structures. Only the relatively remote temporary access shafts reveal the existence of the construction site.

In addition, political decision-makers are attaching increasing importance to trenchless construction methods for underground networks, as major earthworks generate nuisances that are less and less tolerated by the public and the local community, who bear the social costs. These nuisances, which are difficult to quantify, have many impacts. They include

  • pedestrian traffic problems, diverting surface circuits and increasing the risk of personal injury accidents;

  • vehicle traffic jams and diversions;

  • noise nuisance, which for mini and microtunnelers is localized to the reduced construction site footprint;

  • air pollution problems caused by combustion engines (the mini-tunneler uses electric power).

...
You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Mini and microtunnelers

Article included in this offer

"Public works and infrastructure"

( 88 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details

Dans les ressources documentaires

Forage et carottage dans les roches

L'article traite des différentes méthodes de forage utilisées en génie civil, notamment la rotation et la...

Forage et carottage dans les roches

Pour l'exploitation, l'exploration et l'observation des massifs de sols et/ou de roches, les techniques m...

Diagraphies et géophysique de forage

La connaissance d’un terrain sur lequel on prévoit des projets de construction d’ouvrage de génie civil e...

Forages et sondages - Pour la reconnaissances des terrains

Lors des phases de conception et de réalisation d'un projet, la reconnaissance des terrains au droit de l...

WhitePaper Ressources océaniques
5 September 2016
Ressources océaniques

Etant donné la fragilité de l\'équilibre océanique, peut-on vraiment extraire des fonds marins ?

WhitePaper
16 May 2013
Article témoin : Construction

Que son usage soit résidentiel, commercial, industriel ou institutionnel, la construction d\'un bâtiment fait appel à de nombreux intervenants et les techniques...

Tous les livres blancs
Toutes les actualités
Contact us