9. Glossary
Developer
Entity responsible for the overall structure of the project, its organization, and its economic viability. The overall structure of the project includes the roles of design office, developer, and operator. These roles may be performed by one or more separate entities. The developer is backed either by a local or international electricity distribution company, a specialized design office that may or may not be linked to an investor or bank (World Bank, African Development Bank), or an electrical equipment manufacturer.
Investor
Entity responsible for the financial arrangements for the project.
Director
Entity responsible for the construction of the mini-grid.
Operator
Entity that ensures the operation of the...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Glossary
Article included in this offer
"Electricity networks and applications"
(
184 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!