Frequently asked questions
Distinguishing between the declaration system and the declaration system with periodic inspection
Practical sheet REF: FIC0258 V1
Frequently asked questions
Distinguishing between the declaration system and the declaration system with periodic inspection

Author : Solange VIGER

Publication date: July 10, 2017 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. Frequently asked questions

Is the operator required to submit his declaration at the same time as his building permit application in both procedures?

Yes, the building permit application and the declaration must be filed simultaneously. When the planned work concerns a classified facility subject to declaration or declaration with periodic inspection, the building permit application must be accompanied by proof that the declaration has been filed. This document (PC 25) is listed in the "bordereau de dépôt des pièces jointes à une demande de permis de construire".

Can the prefect refuse a declaration on the grounds that the installation has not been inspected?

No, as long as the declaration is in order and complete, the prefect is obliged to issue the operator with a declaration receipt. The prefect has "tied competence", which means that he...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Environment manager"

( 296 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details