5. Frequently asked questions
Is the operator required to submit his declaration at the same time as his building permit application in both procedures?
Yes, the building permit application and the declaration must be filed simultaneously. When the planned work concerns a classified facility subject to declaration or declaration with periodic inspection, the building permit application must be accompanied by proof that the declaration has been filed. This document (PC 25) is listed in the "bordereau de dépôt des pièces jointes à une demande de permis de construire".
Can the prefect refuse a declaration on the grounds that the installation has not been inspected?
No, as long as the declaration is in order and complete, the prefect is obliged to issue the operator with a declaration receipt. The prefect has "tied competence", which means that he...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Environment manager
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Frequently asked questions
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference