Practical sheet | REF: FIC0055 V1

Distinguishing between D, DC, E and AE plans

Author: Solange VIGER

Publication date: October 10, 2018 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!

Automatically translated using artificial intelligence technology (Note that only the original version is binding) > find out more.

    A  |  A

    Overview

    Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

    Read the article

    AUTHOR

     INTRODUCTION

    Since the imperial decree of 1810, the nomenclature has undergone a number of changes designed to prevent and adapt to industrial risks.

    Thus, the ICPE nomenclature is the gateway to the system of classified installations. Over time, modifications to the nomenclature, through the addition or deletion of new headings or changes to thresholds, have always been a significant element in the life of the industrial world.

    In the course of these developments, three classification regimes (D, E, AE) and one classification sub-regime (DC) have been distinguished:

    • How do you identify headings by degree of environmental risk?

    • What are the impacts of different regimes during the operation of an ICPE?

    • What steps do I need to take?

    You do not have access to this resource.

    Exclusive to subscribers. 97% yet to be discovered!

    You do not have access to this resource.
    Click here to request your free trial access!

    Already subscribed? Log in!


    The Ultimate Scientific and Technical Reference

    A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
    + More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
    From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

    This article is included in

    Environment manager

    This offer includes:

    Knowledge Base

    Updated and enriched with articles validated by our scientific committees

    Services

    A set of exclusive tools to complement the resources

    Practical Path

    Operational and didactic, to guarantee the acquisition of transversal skills

    Doc & Quiz

    Interactive articles with quizzes, for constructive reading

    Subscribe now!

    Ongoing reading
    Distinguishing between D, DC, E and AE plans