4. System commissioning
The commissioning of a facility that is not classifiable under the law on classified installations does not require any particular steps to be taken in application of these regulations. However, before starting up the plant and if any construction work is required, the operator must apply for a building permit, which will be examined by the town planning department of the municipality where the plant is located, in conjunction with the authorities responsible for such matters (architect des bâtiments de France if necessary, DREAL, etc.).
It is therefore necessary to check that your buildings comply with the planning regulations applicable to your zone. These regulations may be set out either in a carte communale (a simple urban planning document delimiting buildable areas in small towns), or in a plan local d'urbanisme (a detailed urban planning document regulating...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Environment manager
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
System commissioning
-
articles R. 224-21 to R. 224-30 on minimum output and equipment for boilers with output between 400 kW and 20 MW (former decree no. 98-817 of September 11, 1998)
articles R. 224-31 to R. 224-41 relating to the periodic...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference