2. Delivering on time
Among the important criteria, especially in terms of costs and deadlines, it is preferable to be able to define with the customer the performance limit and the conditions for acceptance of the installations, if this is the subject of the contract.
For example, and here to schematize the two extreme cases, the installation can be received in France by French contacts and then transferred by them, or on site, after installation abroad by local contacts. It's clear from the outset that the context will be very different.
Exporting equipment inevitably involves additional transport costs. But beyond that, you may need to use local contractors who can organize customs clearance and, if necessary, transport of the equipment.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Delivering on time
Article included in this offer
"Design and engineering management"
(
337 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources