Delivering on time
Design a project in France that will take shape abroad
Practical sheet REF: FIC0824 V1
Delivering on time
Design a project in France that will take shape abroad

Author : Jean-Michel LAMBOUR

Publication date: April 10, 2012 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

2. Delivering on time

Among the important criteria, especially in terms of costs and deadlines, it is preferable to be able to define with the customer the performance limit and the conditions for acceptance of the installations, if this is the subject of the contract.

For example, and here to schematize the two extreme cases, the installation can be received in France by French contacts and then transferred by them, or on site, after installation abroad by local contacts. It's clear from the outset that the context will be very different.

Exporting equipment inevitably involves additional transport costs. But beyond that, you may need to use local contractors who can organize customs clearance and, if necessary, transport of the equipment.

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Design and engineering management"

( 337 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us