6. Glossary
Capacity planning
Checking and deciding on the level of capacity needed to meet future demand. This planning can be carried out at a global level, by product family, or at a detailed level, by resource, depending on the time horizon considered.
Spout
Resource (machine, production line, type of personnel, etc.) whose capacity, at a given moment and for a given organization, is the lowest in the production chain under consideration.
Unit time
The time required for a resource or set of resources to manufacture or transform a good product. This takes into account changeover times, non-quality, yield, etc. This time may be standard (calculated as a target) or actual.
Series changeover time
Time elapsed on a resource between...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Glossary
Bibliography
Also in our database
Bibliography
APICS Dictionary - 11 th edition, Éditions MGCM, 2005
CPIM Master Planning of Resources , Éditions MGCM, 2009
CPIM Detailed Scheduling and Planning , Éditions MGCM, 2009
Le système SMED, Shigeo Shingo , Éditions d'organisation, Paris, 1987
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference