Detect machine bottleneck(s) linked to other parameters
Integrating innovation into planning: identifying and resolving bottlenecks
Practical sheet REF: FIC0756 V1
Detect machine bottleneck(s) linked to other parameters
Integrating innovation into planning: identifying and resolving bottlenecks

Author : Étienne LUDWING

Publication date: February 10, 2012 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Detect machine bottleneck(s) linked to other parameters

In addition to these changes, which directly affect resource capacity, there are other, less obvious characteristics of innovation to consider.

3.1 Modification of load distribution between resources

If the innovation leads to a change in load distribution between machines compared to the previous product (for example, instead of requiring a turning operation, then a milling operation, it requires a first milling operation, a second turning operation, and a milling operation again), this will be taken into account in the analysis made in the previous paragraph.

On the other hand, it's just as important to consider the personnel involved, and in particular their qualifications and training. The manufacture of the innovative product may,...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Design and engineering management"

( 337 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details