3. Detect machine bottleneck(s) linked to other parameters
In addition to these changes, which directly affect resource capacity, there are other, less obvious characteristics of innovation to consider.
3.1 Modification of load distribution between resources
If the innovation leads to a change in load distribution between machines compared to the previous product (for example, instead of requiring a turning operation, then a milling operation, it requires a first milling operation, a second turning operation, and a milling operation again), this will be taken into account in the analysis made in the previous paragraph.
On the other hand, it's just as important to consider the personnel involved, and in particular their qualifications and training. The manufacture of the innovative product may,...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Detect machine bottleneck(s) linked to other parameters
Bibliography
Also in our database
Bibliography
APICS Dictionary - 11 th edition, Éditions MGCM, 2005
CPIM Master Planning of Resources , Éditions MGCM, 2009
CPIM Detailed Scheduling and Planning , Éditions MGCM, 2009
Le système SMED, ShigeoShingo , Éditions d'organisation, Paris, 1987
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference