1. Detect machine bottleneck(s) linked to unit time modifications
The essential data to consider when identifying a bottleneck, whether during the manufacture of industrialization series within "normal" production or during the manufacture of the innovative product, are the manufacturing unit times.
Of course, the effects of innovation on these unit times must be taken into account well before the date of the industrialization series, and the actual launch! More precisely, measures to mitigate or eliminate these effects should be decided in advance, according to the time needed to implement them (for example, hiring unskilled staff, when the process allows, does not require the same lead time as installing a new production line, in general).
First of all, we need to quantify the effects of changing times. To do this, you can use the methods described in the file entitled Recenser les données nécessaires...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Detect machine bottleneck(s) linked to unit time modifications
Article included in this offer
"Design and engineering management"
(
337 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!