3. Update the project by loading
Updating the project by workload means entering the actual work done by resources, rather than the actual duration of tasks. Entering by actual duration often does not reveal any slippage. Entering by actual work may show a higher level of progress than would have been calculated by MS Project.
By default, actual work shows actual duration: display [Gantt Tracking]. In the ribbon's [View] tab, open the table list and select the [Work] table. Check the [Details] option in [Split display] and select [Job form] to enter job data. However, "regular" project work does not necessarily correspond to the reality of projects, and actual work must sometimes be defined on the basis of a load plan for your resources.
When actual duration and actual work are independent, display the update from the [Gantt Tracking] and [Tracking] table. Deactivate the...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Update the project by loading
Practical recommendations
To download MS Project 2007 service pack 2 : https://www.microsoft.com/fr-fr/download/details.aspx?id=8230
MS Project 2007 is no longer on the market, but you'll find a range of highly detailed guides in major used book stores.
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference