MS Project 2007 and 2010: update project progress

Author: Sophie TOUBLANC

Publication date: May 10, 2014 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


2. Updating the project through time and work

2.1 Update by duration

Updating the project by duration means entering the actual time that has elapsed between the actual start of the task and the update date. If resources are assigned to tasks, MS Project can calculate the actual work and cost of the project up to the update date.

SCROLL TO TOP

2.2 Update tasks

This involves entering information in the Gantt chart about the task milestone you need to update. Click in the [Schedule] area of the [Task] tab of the ribbon, then on [Mark for tracking], then...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Design and engineering management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Updating the project through time and work