2. Updating the project through time and work
2.1 Update by duration
Updating the project by duration means entering the actual time that has elapsed between the actual start of the task and the update date. If resources are assigned to tasks, MS Project can calculate the actual work and cost of the project up to the update date.
SCROLL TO TOP2.2 Update tasks
This involves entering information in the Gantt chart about the task milestone you need to update. Click in the [Schedule] area of the [Task] tab of the ribbon, then on [Mark for tracking], then...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Updating the project through time and work
Article included in this offer
"Design and engineering management"
(
337 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Practical recommendations
To download MS Project 2007 service pack 2 : https://www.microsoft.com/fr-fr/download/details.aspx?id=8230
MS Project 2007 is no longer on the market, but you'll find a range of highly detailed guides in major used book stores.
...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!