2. Updating the project through time and work
2.1 Update by duration
Updating the project by duration means entering the actual time that has elapsed between the actual start of the task and the update date. If resources are assigned to tasks, MS Project can calculate the actual work and cost of the project up to the update date.
SCROLL TO TOP2.2 Update tasks
This involves entering information in the Gantt chart about the task milestone you need to update. Click in the [Schedule] area of the [Task] tab of the ribbon, then on [Mark for tracking], then...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Updating the project through time and work
Practical recommendations
To download MS Project 2007 service pack 2 : https://www.microsoft.com/fr-fr/download/details.aspx?id=8230
MS Project 2007 is no longer on the market, but you'll find a range of highly detailed guides in major used book stores.
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference