Know how to set up the various ramp-up systems
Rate increases: comparison and choice of principle
Practical sheet REF: FIC0932 V1
Know how to set up the various ramp-up systems
Rate increases: comparison and choice of principle

Author : Jean-Michel LAMBOUR

Publication date: July 10, 2013 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

2. Know how to set up the various ramp-up systems

It should be pointed out that this debate only takes place in the presence of a problem where we have :

  • a large number of shades;

  • each shade being the subject of a different, unknown request.

If we had a choice of three evenly-spaced shades, the debate would be over.

There are two different ramp-up systems:

  • either you start by introducing the least popular of the shades, and by doing so, you take no risk, unless the orders are insufficient to conclude on the success of the ramp-up;

  • or start by testing all the shades, then introduce the most popular one on the line, even if this means saturating the retouching medium for some time.

...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Design and engineering management"

( 337 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details