Setting up ways of working
The PMO (project management office)
Practical sheet REF: FIC1723 V1
Setting up ways of working
The PMO (project management office)

Author : Jean-Pierre PAYRE

Publication date: June 10, 2021 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. Setting up ways of working

In line with the key principles of empowering project teams and simplifying interfaces, a way of working can be defined.

  • Project resources (project manager, contract manager, planners) report directly to the project director.

  • The resources of the other functions are the operational responsibility of the project manager, who, together with the function manager, sets the specific objectives for the project (including validation of the performance review), and then approves leave, travel and expenses.

  • Stability of basic engineering resources is sought for the duration of the project (the project director and project manager validate staffing: mobilization, demobilization, temporary assignment).

  • Project line managers collaborate with the sales...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Design and engineering management"

( 337 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us