Glossary
Successful energy renovation of industrial premises
Practical sheet REF: FIC1781 V2
Glossary
Successful energy renovation of industrial premises

Author : Léon NOUINDE

Publication date: October 10, 2025 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

10. Glossary

Bbio

Bbio, or bioclimatic energy requirement, is one of the three requirements of RT2012. This coefficient represents the energy efficiency of your project's building. The Bbio Project must be lower than the Bbio max defined by RT2012. The value of the Bbio Project is equal to 2 x the heating requirement + cooling requirement) + 5 x the lighting requirements.

CEP

The Cep is a factor used to convert final energy consumption into primary energy. Final energy is the energy that consumers use directly, such as electricity, gas, etc. Primary energy represents the energy required at source to produce this final energy.

Embodied energy

Gray energy is the amount of energy consumed during the life cycle of a material or product: production, extraction, processing, manufacturing,...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Energy resources and storage"

( 200 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details