List the work to be done
Successful energy renovation of industrial premises
Practical sheet REF: FIC1781 V2
List the work to be done
Successful energy renovation of industrial premises

Author : Léon NOUINDE

Publication date: October 10, 2025 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

2. List the work to be done

The energy audit report recommended above must include an energy consumption assessment, quantified indicators corresponding to the costs of the work, and a list of actions and/or work aimed at improving energy efficiency. As part of the renovation, it will be necessary to choose, from among the priority actions listed in the audit report, those that will eliminate the three main sources of energy loss.

2.1 Insulation work

This work remains a priority, as there is no point in installing high-performance energy production systems in buildings that are poorly insulated. Data from ADEME shows that priority should be given to insulating roofs, which can account for nearly 30% of heat loss. Walls come in second place, with heat loss rates of up to 25%. Next, windows,...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Energy resources and storage"

( 200 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details