Practical sheet | REF: FIC1781 V2

Successful energy renovation of industrial premises

Author: Léon NOUINDE

Publication date: October 10, 2025 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


6. Our advice

6.1 Conduct a comprehensive energy audit before any renovation work.

This will enable you to target the most energy-intensive items.

SCROLL TO TOP

6.2 Anticipate the implementation of the RE2020 standard

RE2020 is based on a gradual implementation between 2022 and 2031, with stricter requirements every three years (2022/2025/2028/2031). Since 2023, RE2020 has applied to new industrial buildings and imposes increased requirements on energy consumption thresholds (Cep) and bioclimatic needs (Bbio). Prioritize...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Energy resources and storage

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Our advice