2. Inspection of new installations
2.1 Design conformity
This control is carried out through Spanc's verification of the application file for the installation of a non-collective sanitation system, which must be submitted to the mayor by the owner wishing to carry out such work.
-
For Spanc to be able to give a detailed opinion, this authorization request must provide the following information and documents:
-
general information identifying the applicant :
date of request,
number and date of the planning certificate,
number and date of building permit application (except in the case of rehabilitation),
...
-
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Inspection of new installations
Article included in this offer
"The finishing and equipment of the building"
(
89 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!