How does the PPI fit in with the POI?
Distinguishing between POI and PPI
Practical sheet REF: FIC0437 V1
How does the PPI fit in with the POI?
Distinguishing between POI and PPI

Author : Solange VIGER

Publication date: September 10, 2014, Review date: November 14, 2016 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. How does the PPI fit in with the POI?

3.1 Before an event (preparation of POI and PPI)

Even if your ICPE does not fall within the scope of the PPI, if it is located within the danger circle of an installation subject to the PPI and presents a possible increase in risks or damage ("domino effect"), you may be concerned.

The prefect may then ask you to provide certain information, within three months of notification by the various operators of the existence of a domino effect (interactive major accident process), or within the timeframe imposed by the prefect for specific requests (see arrêté...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Environment manager"

( 296 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details