2. Who is affected by the POI and/or PPI?
You are required to draw up an emergency plan and an emergency response plan if you operate a classified facility subject to the Seveso high threshold regime.
Seveso high threshold establishments are those in which hazardous substances, preparations or mixtures are present in such quantities as to create particularly significant hazards for the health and safety of neighboring populations and for the environment (article L. 515-36 of the Code de l’environnement ).
An establishment is considered to be a Seveso high threshold facility (see Distinguishing between the notions of easement, low threshold and high threshold
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Environment manager
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Who is affected by the POI and/or PPI?
Editor's note
This article is an updated version of the fact sheet written by Marie CATALON.
Regulations
-
article R. 512-29
article L. 552-8
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference