1. Understand the challenges of the Internal Operations Plan
Accident history periodically demonstrates that the occurrence of an accident cannot be definitively ruled out, despite the care taken in risk analysis and the implementation of safety barriers.
When faced with the risk of an accident, it is essential to be prepared (and organized) using emergency plans to reduce the effects and impacts on targets.
The operator of a Seveso high-threshold industrial site must be able to control an incident internally and restore the facility to the safest possible condition.
Seveso high threshold establishments are those in which hazardous substances, preparations or mixtures are present in such quantities as to create particularly significant hazards for the health and safety of neighboring populations and for the environment (article L. 515-36 of the
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Environment manager
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Understand the challenges of the Internal Operations Plan
Editor's note
This article is an updated version of the fact sheet written by Sandrine CHEVILLON.
Regulatory reference
-
article R. 512-29
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference