Practical sheet | REF: FIC1713 V1

Project management process groups and knowledge areas

Author: Jean-Pierre PAYRE

Publication date: October 10, 2021 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


4. Monitoring and control processes by the group

Throughout the project, controls will be carried out at the engineering, purchasing, manufacturing, assembly and testing stages.

The quality manager will ensure that the various technical reviews of the project are carried out in accordance with the management plan, that the minutes of these reviews are published and that validations are carried out (design reviews, purchasing reviews, manufacturing reviews, site preparation reviews and test preparation reviews).

A specific follow-up of non-conformities will be implemented with a list of these non-conformities, a person responsible, a search for the cause, a remedy and a deadline for treatment. These non-conformities will be dealt with throughout the project in the quality plans, especially during the manufacturing phases. Suppliers and subcontractors will be audited to ensure that they...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Design and engineering management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Monitoring and control processes by the group