Push flows: MRP and DRP

Add to my library

AG5110 V1 Article

Push flows: MRP and DRP

Authors : André THOMAS, Samir LAMOURI

Publication date: January 10, 2000 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

Overview

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHORS

  • André THOMAS : Associate professor, teacher and research tutor at ENSGSI (École nationale supérieure du génie des systèmes industriels) - Certified expert in Value Analysis (CEXV) and Industrial Management (CFPIM)

  • Samir LAMOURI : Lecturer in the Organization and Production Engineering Department at the University of Cergy-Pontoise - Researcher at the Centre de robotique de l'École des mines de Paris, Production Systems team

 INTRODUCTION

It's sometimes said that Kanban works on a pull-flow basis and MRP on a push-flow basis. In reality, things aren't quite so simple, because an MRP-type method can very well generate a flow of products on the shop floor whose characteristics approach those of a just-in-time (JIT) pull flow, if sales uncertainty is low, lead times are short, and launches are made as late as possible. Conversely, a Kanban system applied with an excessive number of tickets, on the pretext that the machines must not stop, is more akin to a push flow than a pull flow.

The distinction between push and pull flow is not so much a question of the production scheduling method as of how it is applied:

  • if production is started at any point in the process, following the order defined by a work schedule, as soon as resources are available (materials, machines, manpower) and without taking into account the short-term needs of the downstream process (or the end consumer), the flow is said to be pushed;

  • if the decision to produce depends on the short-term needs of the downstream process (or the real needs of the consumer), the flow is said to be pulled.

Push flow reflects the viewpoint of a "producer", who seeks to make the most of his resources by keeping to his delivery schedule. Pull flow reflects the viewpoint of a supplier seeking to deliver the precise service the customer requires.

In the article "Enjeux de la logistique" in this treatise [3] , Pascal Eymerie discusses the idea of complexity in logistics systems, and in particular the independence of industrial management decisions in the case of shared resources. The complexity of a logistics system is increased by various factors: variety of products manufactured, inertia of capacity and flow decisions, uncertainty of commercial demand, existence of production hazards (machine breakdowns, quality problems, etc.).

But how do you actually manage a complex system? This article traces the evolution of MRP (Manufacturing Resource Planning) and DRP (Distribution Resource Planning) push-flow production and distribution planning systems.

Before the advent of MRP and DRP methods, production and distribution management often boiled down to inventory level management. MRP and DRP methods are particularly well suited to industries which manufacture and assemble a large number of components to order, or in small batches, using batch production methods. This is where production flows are the most difficult to manage. These methods are particularly well suited to the mechanical and assembly industries. Extensions have been...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Push flows: MRP and DRP

Article included in this offer

"Logistics and Supply Chain"

( 85 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details

Contenus associés

Sur le même sujet

Veille personnalisée : Inscrivez-vous !

Dans les ressources documentaires

Planification avancée - L’apport des Advanced Planning Systems

Les systèmes MRP ont évolué à la fin des années 1990 vers des modules «  Advanced Planning Systems  ...

Prévisions systémiques dans la supply chain globale

De plus en plus, les entreprises doivent malgré les attaques financières, spéculatives et économiques, se...

Enjeux de la chaîne logistique – Supply Chain management

Le management de la chaîne logistique, aussi appelé supply Chain management, est un enjeu stratégique maj...

Benchmarking de la supply chain

Le Benchmarking de la supply Chain permet aux entreprises de communiquer leurs problématiques, de mesurer...

WhitePaper
27 January 2015
Robotisation, mode d'emploi

Comment mettre en place avec succès un projet de robotisation dans son entreprise ? Approche, démarche, conseils...

Tous les livres blancs
Toutes les actualités
Contact us