Practical sheet | REF: FIC1678 V1

Measure project progress using performance indicators

Author: Jean-Pierre PAYRE

Publication date: March 10, 2020 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Overview

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHOR

  • Jean-Pierre PAYRE: Senior project manager – Project management consultant, Grenoble, France

 INTRODUCTION

Content, variance and performance forecast indicators are common to all projects. Although they are supplemented by checklists and recommendations, we nevertheless invite you to capitalize on your own tools, as complementary success aids for your future projects.

This fact sheet will help you carry out this key mission:

  • preparation and content indicators ;

  • variance indicators and progress meetings ;

  • preparation of progress reports ;

  • performance forecasting indicators.

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Design and engineering management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Measure project progress using performance indicators