Practical sheet | REF: FIC1840 V1

Implementing responses to the crisis

Authors: Pierre MONGIN, Laurent DELHALLE

Publication date: October 10, 2024 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


2. Activate existing plans

Before a crisis occurs, you will have drawn up these plans in advance, i.e. identified their probability of occurrence and their potential impact, in order to define a proportional response plan.

Based on these – plans, which will never go according to plan, but which provide reference points in a world that suddenly lacks them – implementation begins: the alert is launched and procedures predefined. Response teams are mobilized.

The crisis unit is activated in a dedicated room (which will have been equipped in advance) to coordinate operations.

SCROLL TO TOP
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Management and innovation engineering

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Activate existing plans