Conclusion
Construction site waste management
Archive REF: TBA236 V2
Conclusion
Construction site waste management

Author : Pierre SERIN

Publication date: November 10, 2021 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

14.  Conclusion

Waste is one of the major problems of the 21st century.

The result of an uncontrolled consumer society, they are invading the world, land and sea alike. Some countries are reacting by creating waste policies. Europe has created a six-figure classification according to main producer, waste properties or production sector. The French classification is also based on a breakdown: 325 Mt of waste, of which 238 Mt is from the building and public works sector (182 Mt from public works and 56 Mt from construction). These figures show an average annual increase of 3%.

Regulations cover all players, and are moving towards waste sorting on site or in specialized units, through direct deposit or collection and distribution, so that some waste leaves the status of waste for recovery, enabling it to rejoin the production sector, while the rest is landfilled...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Conclusion

Article included in this offer

"Preparing for construction"

( 117 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us