6. Define or identify technical or operational elements and evaluate their costs
6.1 Evaluate resource allocation: allocate costs by function
Go back to each of the functions listed in the previous step and list the resources used to carry them out.
Component costs are the first item that comes to mind, and can be entered in the functions/components table (Tool Functions/components table ). When a component contributes to several functions,...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Quality manager
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Define or identify technical or operational elements and evaluate their costs
Bibliography
Also in our database
Downloadable tools
Tool
Project tracking sheet (Tool ...
Website
Association Française pour l’Analyse de la Valeur
French Association for Value Analysis website
Reference standards
NF EN 1325: Vocabulary of Value Analysis (Ex NF X50-150)
NF EN 16271: Value management - Functional expression of need and functional specifications - Requirements for the expression and validation of the need to be satisfied in the process of acquiring or obtaining a product, (Ex NF X 50-151)
NF X 50 – 152 : Value management...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference