5. What is the scope of the study?
5.1 Aspects of non-quality
We can distinguish two aspects related to the costs of non-quality:
">the first aspect is linked to the investments made to achieve the level of quality required. This is the price we have to pay to ensure an acceptable level of quality;
">the second aspect is the cost of doing things wrong, of not doing them right the first time.
The resulting cost is potentially twice as high as the investment needed to produce a compliant product.
Investment and structural choices are the responsibility of each company's management, and will not be the subject of this article.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
What is the scope of the study?
Article included in this offer
"Quality manager"
(
214 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!