What is the scope of the study?
Measuring and reducing the cost of non-quality
Practical sheet REF: FIC0493 V1
What is the scope of the study?
Measuring and reducing the cost of non-quality

Author : Jacky LASSALLE

Publication date: October 10, 2022 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. What is the scope of the study?

5.1 Aspects of non-quality

We can distinguish two aspects related to the costs of non-quality:

  • ">the first aspect is linked to the investments made to achieve the level of quality required. This is the price we have to pay to ensure an acceptable level of quality;

  • ">the second aspect is the cost of doing things wrong, of not doing them right the first time.

The resulting cost is potentially twice as high as the investment needed to produce a compliant product.

Investment and structural choices are the responsibility of each company's management, and will not be the subject of this article.

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Quality manager"

( 214 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us